Delta Marine Consultants Singapore have been appointed by F.F. Cruz as the marine structural designer for this design and build project. Pier 3 extension was to accommodate the berthing of 120,000DWT new Panamax container vessel with LOA of 366m without overhang. 3 Nos of 30m gauge new quay cranes will be installed to facilitate the container loading and uploading from the new Panamax vessel or any other smaller vessel.
Delta Marine Consultants Singapore supported the contractor in the tender design and detailed design which the design was governed by heavy seismic loads. The construction is currently ongoing, whereby we provide technical support services for the construction and testing work for i.e. piling concrete casting, demolition, material specification, temporary works, etc.